/logo.svgIpoTec


Susan Electricals Ipo


Susan Electricals IPO Review & Key Points

  • Review: Neutral

IPO Lead Managers aka Merchant Bankers

  • Seren Capital Pvt.Ltd.

Name of the Company Face Value (₹) EPS basic (₹)  EPS Diluted (₹) RONW (%) P/E Ratio NAV (₹)
Powerica Limited 5 15.26  15.26 15.37 %  24.45 99.76
Listed Peers
Cummins India Limited 2 72.15  72.15 26.45% 64.13  272.78
Kirloskar Oil Engines Limited 2 33.71 33.60 15.85% 43.24 212.60
NTPC Green Energy Limited 10 0.67 0.67 2.58% 129.40 21.88
Acme Solar Holdings Limited 2 4.55 4.53 5.59% 50.74  74.54
Adani Green Energy Limited 10 8.37 8.37 11.90%  101.53  76.62

IPO Open DateJune 11, 2026
IPO Close DateJune 15, 2026
Face Value₹10 Per Equity Share
IPO Price Band₹120 to ₹127 Per Share
Issue SizeApprox ₹70.38 Crores
Fresh IssueApprox ₹60.22 Crores
Offer for Sale:Approx 8,00,000 Equity Shares
Issue TypeBook Building Issue
IPO ListingBSE SME
DRHP Draft Prospectus
RHP Draft Prospectus

ApplicationLot SizeSharesAmount
Retail Minimum22,000₹2,54,000
Retail Maximum22,000₹2,54,000
S-HNI Minimum33,000₹3,81,000
S-HNI Maximum77,000₹8,89,000
B-HNI Minimum88,000₹10,16,000

Investor CategoryShare Offered-% Shares
Anchor Investor15,23,000 Shares27.48%
QIB (Ex. Anchor)10,16,000 Shares18.33%
NII Shares Offered7,65,000 Shares13.80%
Retail Shares Offered17,80,000 Shares32.12%

Anchor Bidding DateJune 10, 2026
Anchor Investors List
Shares Offered15,23,000 Shares
Anchor Size19.34 Cr.
lock-in period end date 50% shares (30 Days) July 16, 2026
lock-in period end date 50% shares (90 Days) Sep 14, 2026

IPO Open Date:June 11, 2026
IPO Close Date:June 15, 2026
Basis of Allotment:June 16, 2026
Refunds:June 17, 2026
Credit to Demat Account:June 17, 2026
IPO Listing Date:June 18, 2026
IPO Bidding Cut-off Time:June 15, 2026 – 5 PM

ParticularShares% Share
Promoter Holding Pre Issue1,55,88,79592.47%
Promoter Holding Post Issue2,03,30,79566.97%

PurposeCrores
Funding of Capital expenditure towards Expansion of existing Manufacturing Facility situated at Plot No.18/31, Sahibabad, Ghaziabad, Uttar Pradesh₹7.72
Funding of Working Capital Requirements₹33.00
General Corporate Purpose₹-

Period EndedRevenueExpensePATAssets
2023₹77.56₹77.00₹0.40₹33.58
2024₹103.59₹102.50₹0.76₹38.08
2025₹136.05₹128.21₹5.65₹73.68
2026₹269.96₹245.34₹18.25₹130.05

KPIValues
ROE:64.64%
ROCE:29.05%
EBITDA Margin:11.91%
PAT Margin:6.77%
Debt to equity ratio: 1.73
Earning Per Share (EPS):₹11.96 (Basic)
Price/Earning P/E Ratio:N/A
Return on Net Worth (RoNW):47.42%
Net Asset Value (NAV):₹24.68

CompanyEPSPE RatioRoNW %NAVIncome
Prime Cable Industries Limited6.6816.7720.1433.17235.81 Cr.
Divine Power Energy Limited10.8346.3520.6951.71627.48 Cr.
V-Marc India Limited40.9727.9034.56118.551,800.48 Cr.

Period Ended Revenue Expense PAT Assets
2023 ₹184.81 ₹154.97 ₹32.10 ₹251.58
2024 ₹206.45 ₹175.85 ₹34.44 ₹339.25
2025 ₹322.58 ₹261.43 ₹28.13 ₹455.49
Dec 2025 ₹236.50 ₹186.96 ₹38.69 ₹561.34

Disclaimer:Logos and other registered trademarks of funds used on this platform are held by their respective owners. IpoTec does not claim ownership or association on them, and their use is purely for informational and illustrative purposes.

Copyrights ©2026 IpoTec. All rights reserved.